Product: Galvanized steel Solar Energy system
1.Enables easy,fast and cost-effective installation.
2. Flexible post spacing withstands different wind&snow loads.
3. High quality material in Galvanized steel, Aluminum and SUS 304.
4. Highly corrosion resistant surface treatment.
5. Screws and nuts go with every componts needed.
6. Fasteners and rail nut fully configured to save extra parts purchasing.
7. Mechanical calculation and reliability tested to ensure highset product quality.
8. 12-25 years system and structural guarantee.
Specification:
Type:Galvanized steel Solar Energy systemInstallation site:According to your requirementsMaterial:Galvanized SteelFasten material:Aluminum,SUS304,steelSurvival Wind Speed:< 60m/s Design Snow load:Up to 1.4KN/ Square metersSolar panel type:framed or framelessPanel Orientation:Transverse or verticalDesign Standard:CE;IOS9001;SGSQuality warranty:12-25 yearsDuration:More than 20 yearsDelivery time:7-15 daysPackage:Standard Packing
Mounting solution:
Classic case:
Package and delivery:
Customer visit:
Contact us now
In order to help you get the right system, please offer the following necessary info:
1. Dimension of solar panels(length*width*thickness)?
2.Solar panels array?
3. Where to install (which kind of rooftop or ground)?
4. Tilt angle?
5. Any requirements about wind load and snow load?
Delivery & shipment:
FAQ
Q1: What is your MOQ?
A: 500kg for general products. More than 5 tons for new products.
Q2: Can you do customized?
We have professional engineer to design CAD drawing and establish mould according to customers' requirement.
Q3: What certification do you have? What's your standard?
A: We have ISO certification. Our standard is DIN, AAMA, AS/NZS, China GB.
Q4: What's the delivery time for mass production?
A: Normally two weeks. Or according to your order quanitty.
Q5: What's the packing way?
A: Commonly we use shrink films or kraft paper, cartons and pallets also we can make as per customers' requirements.
Q6: What's the payment terms?
A: Usually by T/T, 30% deposit and the balance paid before shipment, L/C is also acceptable.